Church Building
The most important accomplishment is that the Church building (St. George Church and Priest Residence) is now safe, usable and inhabitable. Church Outside Church Inside
The second important accomplishment is that the most of the necessary liturgical items were obtained.
- Repaired the building including roof and walls (dirt roof, steel and concrete replacment, steel and ready mix concrete, interior plastering, tiling)
- Installed 15 windows, 2 safety steel doors, 6 interior doors, sewage and water with sanitary facilities, electric wiring and lighting
- Obtained:
- Altar and Preparation Table
- Altar cloths
- Candles
- Icon of St. George for front of Church
- Ten Icons within the Church
- Incense
- Liturgical Book and two Stands
- Safe permanent seating for the people (new benches)
- Vestments for the priest and altar servers
- Water net and water storage containers
- Maintainance repainting
- Maintainance repair
Church Class Room
The most important accomplishment is that religious education material for the children was obtained.
The second important accomplishment is that a Class Room was built.
- Built Class Room
- Obtained Religious education material for children
Church Play Area
The most important accomplishment is that the children have a clean, safe, and secure place to play.
The second important accomplishment is that the swing was installed.
- Obtained and installed swing
- Obtained tricycle
Church Grounds
The most important accomplishment is that the grounds are a beatiful, safe, and secure place.
The second important accomplishment is that the wall protecting the Church's property was built.
The third important accomplishment is that the road to the Church's property was paved.
Paved road to the Church's property
Restored Well
Planted trees and flowers
Cleaned the Church grounds |